0+
Homes finished since 1997
0
Years in business
0
Ontario regions served
0
Divisions of work

Scope

Suites, common areas and everything between.

Multi-residential finishing is a logistics problem as much as a finishing one. Access is controlled, hoisting is scheduled, floors turn over in sequence, and the finishing trade is frequently the last one through before occupancy.

We work on stacked townhome blocks, mid-rise and high-rise residential, purpose built rental and condominium projects, for both new construction and repositioning of existing buildings under a capital plan.

Coverage

Across the building.

Suites

Complete suite finishing by floor and by suite type, sequenced to the turnover schedule and tracked against the schedule of finishes. Walls, ceilings, trim, doors and cabinetry, finished to the same standard in the first suite and the last.

Corridors and lobbies

Corridor finishing, lobby and entrance areas, wallcoverings, accent finishes and painted metal doors and frames.

Amenity space

Party rooms, fitness and wellness areas, co-working lounges, guest suites and rooftop terraces.

Back of house

Service corridors, storage and locker areas, stairwells, mechanical and electrical rooms, and painted line marking where required.

Parking levels

Painted ceilings, columns, bollards, wayfinding and level identification in below-grade and structured parking.

Turnover and PDI

Suite-by-suite rectification ahead of interim occupancy, deficiency lists and warranty attendance after registration.

Occupied buildings

Working in a building that stays open.

Repositioning an existing building means working around residents, a property manager and a board. The finishing standard matters, but so does whether the corridor is usable at six o'clock and whether residents were told what was happening.

  • Work zoned by floor or wing so only part of the building is affected at a time
  • Notices prepared for the property manager to circulate in advance
  • Low-odour products selected where occupancy requires it
  • Corridors and exits returned to full use at the end of every shift
  • Scheduling around elevator bookings, moves and building quiet hours
  • Progress reporting suitable for a board or capital planning file
Stacked townhome elevations, entrances and garages

Photographs

From our multi-residential contracts.

Finished suites in Waterloo and Kitchener, completed blocks, and sites under construction.

Common questions

Low-rise and high-rise.

Do you work on occupied buildings?

Yes. Work is zoned by floor or wing, notices are prepared for the property manager to circulate, and corridors and exits are returned to full use at the end of every shift.

Can you finish suites to a turnover schedule?

Yes. Suites are sequenced by floor and by suite type against the turnover schedule, with suite-by-suite rectification ahead of interim occupancy.

Do you handle corridors, lobbies and amenity space?

Yes, including wallcoverings, accent finishes and painted metal doors and frames.

What about parking levels?

Painted ceilings, columns, bollards, wayfinding and level identification in both below-grade and structured parking.

Can you provide reporting for a board or capital planning file?

Yes. Progress reporting suitable for a condominium board or a capital planning file is available on request.

References

From the people who supervise our work.

Client names and companies are withheld as a matter of policy. Named references are provided directly with any tender or quotation.

Inquiries

Inquire about this division.

Send the drawings, the finish schedule or simply the unit count and an anticipated start.

Call (519) 729-6271 Request a quote